In-Situ Stabilization and Solidification Beaumont, TX

Project Description

  • 30,000 Cubic Yards of impacted soil solidification and stabilization
  • Construction of 5 Acre containment cell cap
  • Excavation of 5 000 Excavation of 5,000 Yards of petroleum/ lead impacted soil
  • All work performed in Level B PPE
  • Project Timeline: 1st and 2nd Quarter of 2015

Project Details

  • Date: 2nd Quarter of 2015

  • Location: Southeast Texas

Project Gallery

Download PDF