Evansville, IN PCB Soil Remediation

Project Description

  • Excavation of PCB impacted soil up to 12’ deep
  • Excavated & transported 5,000 cubic yards of PCB-impacted material
  • Utilized GPS Rover to outline confirmatory sampling grid
  • Filtered 50,000 gallons of heavy metal contaminated water through activated carbon & cation exchange system
  • Handled, transported, and disposed of 50,000 gallons of wastewater

Project Details

  • Date: December 2017-May 2018

  • Client: ERM

  • Location: Evansville, IN

Project Gallery

Download PDF