Former MGP Facility Goshen, IN

Project Description

Northern Indiana

  • 20,000 cubic yards of soil excavated
  • 100 individual well points installed for dewatering
  • Over 1,000,000 gallons of water treated and discharged to local WWTP
  • Project completed during winter months of 2015
  • 200+ feet of temporary shoring installed
  • 400 feet of 18-inch RCP storm sewer installed
  • 20 foot deep 8 foot diameter interceptor structure installed

Project Details

  • Date: Winter 2015

  • Client: NiSource

  • Location: Goshen, IN

Project Gallery

Download PDF