MGP Remediation Utility Installation

Project Description

• Installation of 12 precast concrete structures to 12 feet below grade
• Dewatering and containerization of MGP impacted water
• Installation of several thousand feet of fusion welded HDPE Pipe
• Installation of multiple Jack and Bore Casings under active roadway
• Dewatering of Jack and Bore Pits
• Project Value – Approximately $1,000,000

Project Details

  • Date: Fall 2019

  • Client: Ramboll/OBG

  • Location: Waukegan, IL

Project Gallery

Download PDF