Landfill Closure Morgantown, KY
Project Description
- 30 acre landfill
- 4 month project
- Mass excavation
- Air/gas collection layers
- 4,000 feet of air collection pipe
- 30,000 ton of gravel for air collection layer
- Landfill lining and cap closure
- Rock excavation
- Road relocation
- 3,000 ton of rip rap
- Environmental erosion reduction
- 10,000 ton of rip rap
- Cast in place concrete and corrugated metal pipe drainage structures
- Precautions taken for ammonia gas seeping from landfill