Portland, IN Water Management Program

Project Description

  • Utilization of hydro- excavation to clear 1,000+ feet of trenching
  • Installation of several stormwater sewers and structures near active high-pressure gas lines
  • Installation of 2-duplex pump stations (with associated valve boxes)
  • Construction of 500 ft of new roadway to promote stormwater drainage
  • Installation of 300 cy of reinforced concrete slabs and curbs

Project Details

  • Date: October-December 2018

  • Client: GHD/TransCanada

  • Location: Portland, IN

Project Gallery

Download PDF