Waterway Pipeline Protection and Restoration
Project Description
• Excavated and regraded bank(s) of creek.
• Cleaned out and leveled area under exposed pipeline in creek.
• Installed 1000 tons filter gravel and geotextile material.
• Installed 3800 tons rip rap.
• Restoration using 500 tons of topsoil, seed and straw over disturbed areas.