Bank and River Restoration Waynesboro, VA

Project Description

  • Installed 1/4 mile cofferdam & dewatering system
  • Excavated & transported several thousand tons of impacted soil
  • Placed 18,000 SF of HDPE geocell, mixed biochar soil amendment with subgrade fill
  • Compacted backfill and re-graded slopes to 2:1
  • Installed 14,000 SF of bank stabilization materials i.e. stone toe, coir fabric, anchored tree logs
  • Self performed continuous personnel & perimeter air monitoring

Project Details

  • Date: Spring 2018 – Present

  • Client: DuPont

  • Location: Waynesboro, VA