West Lafayette, IN Landfill Slope Repair Landfill

Project Description

  • Installation of 15,000 SF of Hydroturf-Z Material
  • Installation of multiple turf swales
  • Installation of two drainage pipes
  • Work conducted off crane mats as landfill cap would not support equipment

Project Details

  • Date: Summer 2016

  • Client: Purdue University

  • Location: West Lafayette, IN

Project Gallery

Download PDF